Amperzen Logo

Add to Technorati Favorites

Event Calendar

Gumshoe Review Logo

SFRevu Robot Logo

TechRevu Ad

Finished my sweater….hurrah!

Blue top-down sweaterI’m rather proud of myself in finishing this sweater. It’s not just that I finished it. It’s that for the very first time, I’m made a sweater from scratch with no pattern. I had a book on top-down sweaters and that told me that I had to increase every row or if not every row then when I did I had to do the equivalent number of increases for the total of the rows that I’d done. I swatched and swatched and still had a few problems.

I used the swatch and measurements to decide just how many stitches to cast on and then once I got about an inch found out it was way to big. Frogged. Reduced the number of stitches by a third and started again. It looked like it was going to be all right until I did the join under the arms and tried it on and found the neck was too loose again. What the heck, I decided I’d pick up stitches around the neck after I finished and knit up an inch or inch and a half — that’s what I did this weekend.

So, I finally finished the neck and wove in the few ends there were and tried it on. It may not look like much to you but it’s a real accomplishment to me. My first sweater that’s from my mind — to yarn — to finish. It’s rather exciting. I did a happy dance and glowed a bit after it was done.

Of course, now that the temps are in the 80s and above, I won’t be wearing it much until fall. It was in the 60s and rainy outside all day. We walked down to the road to get the paper between downpours. But, with the furnace out of it, it was 80 in the house. We kept the sliding doors open with just the screen to let fresh (cooler) air in and the living room was fine. Of course, we had to close it when the rain sheeted at a slant. The rain also meant we didn’t get to do any of the yard work we had planned for today.

Since we couldn’t work outside, we moved some basement boxes and got ready for some major clean up. I dug out a sweater project I had on the needles last spring for a short cotton cardigan. I finished the back and half of one front so guess that’s now on the top of the to-be-finished list. I’m on a roll in the finishing knit projects. I’ve got to make a list of all the things on my needles and figure out a way to get them done.

Maryland Sheep and Wool is the first weekend May and I intend to have a few of these lingering projects finished and a list of projects I want to do so I can have a bit of organization to my wandering the booths. Who am I kidding? I don’t know. I’ll have a great time just breathing in the wool fumes and patting the fiber.

Comments are closed.